School canopy case study
North Curry Church of England Primary School
L-shaped canopy configuration at North Curry Primary School, wrapping around two sides of the playground to maximise covered outdoor space on this rural Somerset school site.

What the client needed
The school needed to cover multiple playground zones without a single straight run being sufficient, requiring a custom L-shaped configuration.
What we installed
A bespoke L-shaped canopy structure following the playground perimeter, providing covered space on two elevations simultaneously.
The result
Significantly more usable covered outdoor space than a standard straight canopy, making the most of the available site.
Project photos
Select a photo to see it larger.
More case studies
View all 64 case studies
EducationSchool Canopies
St Saviour's School
UK
Twin dome canopy installation at St Saviour's School, providing two adjacent covered areas with an architectural dome profile...
Read the case study
EducationSchool Canopies
Hazelwood School
UK
Wall-mounted canopy at Hazelwood School, fixed directly to the school building to create covered outdoor access and play space...
Read the case study
EducationSchool Canopies
Ridgeway Primary School (Site 2)
UK
Second canopy installation at Ridgeway Primary School, expanding covered outdoor provision following the success of the original...
Read the case study
Planning a project like this?
Tell us about your site and what you need. We will come back to you with a free quote.